RTE

Business Situation

In May 2001, RTE initiated the migration of their existing Windows 3.x and Novell infrastructure to a Windows NT 4 based infrastructure. The pace of deployment was slower than had been anticipated with only 2 of the 6 concerned French areas deployed by December 2000.

 

Solution

Avanade was asked to take over the role of national and regional deployment co-ordination. Avanade broke the project into 3 phases:

  • Month 1: After auditing of the deployment already completed, Avanade made recommendations on the methodology, the organization and the planning necessary for the national deployment.
  • Month 2 to Month 5: Preparation of the deployment methodology; detailed project planning, and technical readiness work (eg automation of application installation, deployment method for sites with less than 30 PCs etc).
  • Month 5 to Month 7: Deployment, with Avanade responsible for National and Area deployment coordination and technical support for the deployment coordination team; and development and maintenance of the installation program.

 

Results

  • Successful deployment within the planning timeframe and resource commitments of RTE
  • New architecture for small sites (<30 desktops) and delivery in the timeframe of a new optimized method for small sites
  • Delivery of a new robust applications installation program
  • Improved methodology and support for the teams performing the deployment in the regions including training and associated tools
  • Replacement of old workstations in order to simplify logistics and reduce timeframes

      