SHARE
Share
Contact
Send an email
Follow us
Press inquiries
Careers
Locations near you
RTE - Application Development Case Study
RTE

Business Situation

In May 2001, RTE initiated the migration of their existing Windows 3.x and Novell infrastructure to a Windows NT 4 based infrastructure. The pace of deployment was slower than had been anticipated with only 2 of the 6 concerned French areas deployed by December 2000.

 

Solution

Avanade was asked to take over the role of national and regional deployment co-ordination. Avanade broke the project into 3 phases:

  • Month 1: After auditing of the deployment already completed, Avanade made recommendations on the methodology, the organization and the planning necessary for the national deployment.
  • Month 2 to Month 5: Preparation of the deployment methodology; detailed project planning, and technical readiness work (eg automation of application installation, deployment method for sites with less than 30 PCs etc).
  • Month 5 to Month 7: Deployment, with Avanade responsible for National and Area deployment coordination and technical support for the deployment coordination team; and development and maintenance of the installation program.

 

Results

  • Successful deployment within the planning timeframe and resource commitments of RTE
  • New architecture for small sites (<30 desktops) and delivery in the timeframe of a new optimized method for small sites
  • Delivery of a new robust applications installation program
  • Improved methodology and support for the teams performing the deployment in the regions including training and associated tools
  • Replacement of old workstations in order to simplify logistics and reduce timeframes

      

By using this site you agree that we can place cookies on your device. See our privacy policy for details.
© 2013 Avanade Inc. All Rights Reserved.